Posted on 2026-09-24
Makkah International Airport Heliport Lighting Package Opens Bidding
The Makkah International Airport project now includes a dedicated heliport with an advanced LED lighting system, and the package is ready for bids. Contractors who understand Saudi aviation standards and can deliver reliable, energy‑efficient lighting have a clear opportunity to win work on a high‑visibility national asset.
Project Overview
Makkah International Airport is being expanded to serve the growing passenger flow for the holy cities. A separate heliport is part of the plan, designed for medical, VIP and emergency operations. The airport authority has specified LED runway and obstruction lighting that meet ICAO requirements and Saudi GACA standards. The lighting suite will cover approach, edge, threshold and heliport floodlights, plus beacon and status lights for the helideck.
What It Means for Owners and Contractors
For airport owners the new system promises lower operating costs, reduced maintenance trips and better visibility during night or low‑visibility conditions. LED modules have a life expectancy of 50,000 hours, which translates into fewer replacements and less downtime for the heliport.
For contractors the tender is a chance to demonstrate competence in several areas:
- Engineering design that integrates lighting control with the airport’s existing AGL system.
- Supply of certified LED fixtures that can survive the desert climate.
- Installation practices that respect the tight safety zones around the heliport.
- Commissioning and testing that satisfy GACA’s photometric standards.
The bid will be evaluated on technical compliance, delivery schedule and after‑sales support. A contractor that can show a track record on similar airport projects – especially those involving LED runway or obstruction lighting – will be viewed favourably.
Northlane Solutions’ Capabilities
At Northlane Solutions we have delivered LED runway edge lights, high‑intensity obstruction lights and heliport floodlights for several Saudi airports. Our portfolio includes full‑service projects from design through to maintenance contracts. We work with GACA‑approved suppliers and our engineers are familiar with the latest control and monitoring platforms.
Our Airfield Ground Lighting service covers specification, supply and installation of runway, taxiway and heliport fixtures. Through Helipad & Heliport Solutions we provide layout planning, marking services and fire‑fighting system integration. For critical structures we install Obstruction Lighting that meet both visual and regulatory criteria.
How to Position Your Bid
- Show local compliance – reference GACA circulars and ICAO Annex 14. Include any previous Saudi airport projects in your technical narrative.
- Detail energy savings – calculate expected power reduction versus conventional halogen fixtures. A 30 % drop in consumption is typical for LED replacements.
- Present a clear schedule – the airport expects installation to finish within the next 12 months. Break the timeline into design, procurement, installation and testing phases.
- Offer post‑installation support – a maintenance contract for five years, with spare‑parts logistics, strengthens your proposal.
- Partner with a proven supplier – if you do not produce the LEDs yourself, list the certified manufacturer you will use and attach their product data sheets.
By aligning your proposal with these points you demonstrate that you understand both the technical demands and the operational priorities of the airport authority.
FAQ
What types of LED fixtures are required for the heliport?
The tender calls for runway edge LEDs, heliport floodlights, beacon LEDs and status lights for the helideck. All fixtures must have a minimum IP66 rating and comply with ICAO Annex 14 lighting categories.
How long is the expected warranty for the lighting system?
Most manufacturers provide a five‑year performance warranty on LED modules, with a ten‑year lumen maintenance guarantee. Contractors should include these terms in their offer.
Are there any specific testing requirements before handover?
Yes. Photometric testing, electrical continuity checks and control‑system integration tests must be completed and signed off by GACA inspectors before the system is accepted.
Can a subcontractor handle the installation if the main contractor lacks experience?
A subcontractor with proven airport lighting experience can be engaged, but the primary contractor remains responsible for overall compliance, schedule and quality assurance.
