Northlane Solutions

Posted on 2026-09-08

Makkah Airport Heliport Lighting Package Opens New Bidding Opportunities

Contractors looking at the Makkah International Airport project now have a clear opening: the heliport’s lighting system will be tendered soon, and firms with LED runway or obstruction‑lighting expertise can position themselves for a sizable award in the Kingdom's fast‑growing aviation infrastructure sector.

Context: Makkah International Airport heliport

Al‑Marwan’s recent announcement confirms that the new Makkah International Airport will include a dedicated heliport equipped with advanced lighting. The heliport is designed to support high‑frequency H‑1 and H‑2 class operations, serving pilgrims, medical evacuations and government flights. Lighting is a core safety element; it must meet GACA standards for visibility, reliability and energy efficiency. The project’s public documents highlight a full suite of floodlights, beacons and obstruction lights, all to be supplied as a single package.

Scope of the lighting package

The tender will cover several distinct items:

  • Heliport floodlights that provide uniform illumination across the landing pad, allowing night‑time operations without glare.
  • Heliport beacons mounted on the mast to give pilots a clear visual reference from distance.
  • Medium‑intensity obstruction lights on nearby structures and antennae, ensuring obstacle clearance.
  • Control and monitoring system that integrates the lights with the airport’s central AGL network, enabling remote status checks and fault diagnostics.

All components are expected to be LED‑based, offering lower power consumption and longer service life compared to traditional halogen units. The package also calls for a maintenance contract that includes periodic photometric testing and spare‑part provisioning.

Implications for owners and contractors

For airport owners, the new lighting system promises reduced operating costs, higher reliability and compliance with international safety benchmarks. Energy savings can be significant; LED fixtures typically consume 40‑60 % less power than older technologies. Maintenance cycles are longer, meaning fewer shutdowns for lamp replacement.

Contractors entering the bid must demonstrate proven experience with LED runway and obstruction lighting. GACA’s evaluation will look at past project performance, ability to meet strict photometric specifications and capacity to deliver a local support network. Companies that can combine supply with a clear after‑sales service plan will stand out.

Northlane Solutions’ practical experience

Northlane Solutions has delivered LED runway edge lights, taxiway lighting and obstruction systems across multiple Saudi airports. Our portfolio includes full‑life‑cycle projects – from design and installation to long‑term maintenance contracts. We operate a dedicated Helipad & Heliport Solutions team that tailors lighting layouts to the unique geometry of each pad. Our Airfield Ground Lighting service integrates fixtures with the airport’s control architecture, ensuring real‑time monitoring and fault isolation. Through our Obstruction Lighting division we have installed medium‑intensity towers on complex sites, meeting both visibility and aesthetic requirements.

On recent projects we introduced constant‑current regulators that keep LED output stable despite voltage fluctuations, a common issue in desert environments. Our field teams conduct photometric testing on‑site, delivering certification reports that satisfy GACA auditors. The combination of supply expertise and on‑ground support gives us confidence that we can meet the Makkah heliport’s expectations.

Guidance for bidders

  1. Study the tender documents early. Identify the exact photometric levels required for floodlights and beacons; the specifications often reference ICAO Annex 14 values.
  2. Align your proposal with GACA’s energy‑efficiency goals. Highlight LED power consumption, expected annual savings and any renewable‑energy integration you can offer.
  3. Present a clear maintenance roadmap. Include routine inspections, spare‑part logistics and a response time guarantee – owners prefer a single point of contact for all post‑installation issues.
  4. Show local capability. Demonstrate that you have Saudi‑based technicians, warehousing and a supply chain that can deliver critical components within 2‑3 weeks of request.
  5. Use proven technology. Reference projects where you supplied the same type of floodlights or obstruction towers, and provide performance data.

By following these steps, contractors can submit a bid that not only meets the technical criteria but also addresses the operational concerns of the airport owner.

FAQ

What types of lighting are included in the heliport package?

The package comprises LED floodlights for the landing surface, beacon units on the mast, medium‑intensity obstruction lights on nearby structures and a control‑monitoring system that links all fixtures to the airport’s central AGL network.

How does LED lighting affect operating costs?

LED fixtures consume roughly half the power of conventional lamps and have a service life of 50 000 hours or more, which reduces both electricity bills and the frequency of lamp replacements.

What maintenance services are expected after installation?

Owners typically require periodic photometric testing, fault diagnostics via the control system, and a supply of spare LEDs and drivers. A maintenance contract often covers these activities for a period of 5‑10 years.

Can Northlane Solutions support the entire project lifecycle?

Yes. We provide design, supply, installation, integration with the AGL control system and long‑term maintenance. Our experience across Saudi airports means we understand local regulations and environmental challenges.

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101