Vertiport Planning and Design
Vertiport planning and design covers site selection, layout and airspace study for dedicated electric vertical takeoff and landing infrastructure, applying ICAO Doc 9261 heliport principles and emerging vertiport guidance since dedicated eVTOL standards are still maturing. NLS provides this planning and design capability for Saudi developers preparing sites ahead of advanced air mobility operations.
An infrastructure category still being written
Advanced air mobility, electric vertical takeoff and landing aircraft operating from dedicated ground infrastructure, is moving from demonstration flights toward planned networks in several markets. GACA and ICAO are still developing dedicated vertiport standards, distinct from conventional heliport rules, to account for electric propulsion, charging infrastructure and different approach and departure profiles. Saudi Arabia's own regulatory framework for vertiports is not yet finalized. Planning a vertiport today means building on the closest established base, ICAO Doc 9261 heliport design guidance and FAA engineering brief material on vertiports, while designing in the flexibility to adapt once dedicated national standards land.
What planning and design covers
A vertiport planning study starts with site selection: proximity to demand centres, obstacle environment, approach and departure surfaces, and compatibility with surrounding land use. From there the scope moves into layout, touchdown and liftoff area sizing, final approach and takeoff area, taxi and parking positions for multiple aircraft, and the physical separation needed between simultaneous operations. Because electric aircraft need charging between flights, the layout also has to account for charging bay positions and the electrical infrastructure feeding them, which conventional heliport layouts do not need to plan for.
Why this differs from a conventional heliport
A vertiport shares much of its geometry logic with a heliport but adds requirements a helicopter site never had: higher throughput expectations for urban air mobility routes, charging downtime built into the turnaround cycle, and in many concepts, vertical takeoff profiles steeper than a conventional helicopter approach. Site planning has to reserve for these differences even where the exact numeric criteria are not yet formally published, so the site does not need re-engineering once a standard is finalized.
NLS scope for Saudi developers
NLS supports developers and master-planners preparing for advanced air mobility with site assessment against the available heliport and vertiport reference material, obstacle and airspace review, conceptual layout development, and coordination groundwork ahead of the regulatory framework maturing further. This is forward capability building, positioning a site to be ready when dedicated vertiport rules are confirmed, not a claim that a finished vertiport has already been certified in the Kingdom.
Honest positioning on standards maturity
No aviation authority, including GACA, has yet published a complete vertiport-specific design code the way ICAO Annex 14 covers aerodromes. NLS designs against the best available current guidance and stays engaged as the framework develops, instead of presenting speculative numeric criteria as settled fact.
Specifications
- ✓Site selection review against obstacle environment, approach and departure surfaces, and surrounding land use
- ✓Conceptual layout referencing ICAO Doc 9261 heliport design principles and available vertiport engineering guidance
- ✓Touchdown and liftoff area, final approach and takeoff area, and taxi and parking position sizing
- ✓Charging bay positioning and electrical infrastructure coordination within the site layout
- ✓Airspace and obstacle study coordinated with the applicable Saudi aeronautical review process
- ✓Design flexibility maintained for adaptation once dedicated national vertiport standards are finalized
Frequently Asked Questions
Are there official vertiport design standards in Saudi Arabia yet?+
Not a finalized, dedicated national code. GACA and ICAO are still developing vertiport-specific guidance distinct from conventional heliport rules. NLS plans and designs against the closest established reference material, ICAO Doc 9261 and available engineering guidance, while building in flexibility for when dedicated standards are confirmed.
Can a vertiport site be planned before eVTOL operations are confirmed in Saudi Arabia?+
Yes, and doing so early is the point. Site selection, obstacle review and conceptual layout can proceed now so a developer's land is ready to move quickly once operations and dedicated standards are confirmed, rather than starting the assessment from zero at that point.
How does vertiport planning differ from planning a conventional helipad?+
The core geometry logic is related, but a vertiport layout also has to reserve space and electrical capacity for aircraft charging between flights, and typically plans for higher operational throughput than a single conventional helipad. NLS accounts for both from the earliest site assessment stage.
Who supplies Vertiport Planning and Design in Saudi Arabia?+
Northlane Solutions (Northlane Solutions Company) supplies Vertiport Planning and Design across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@northlanesolution.com for a quotation.
Related products

Vertiport Lighting Systems
Vertiport lighting systems mark touchdown and liftoff areas, approach paths, taxi routes and charging positions for electric vertical takeoff and landing aircraft, adapted from established heliport lighting practice under ICAO Doc 9261 while dedicated vertiport lighting standards are still developing. NLS supplies and installs vertiport lighting for Saudi sites preparing for advanced air mobility, sourced from established international aviation lighting OEMs.

eVTOL Ground Infrastructure
eVTOL ground infrastructure covers the charging, ground handling and support systems an electric vertical takeoff and landing site needs beyond the landing surface itself, including charging equipment integration, ground power and passenger or cargo handling areas. NLS delivers this ground infrastructure capability for Saudi sites preparing for advanced air mobility, sourced from established international suppliers and integrated with the site's civil and electrical works.
Guides
Planning a Halogen to LED Airfield Ground Lighting Conversion
How to plan a halogen to LED airfield ground lighting conversion: CCR compatibility checks, mixed-circuit operation during phasing, photometric requirements, and sequencing work without closing the runway.
Saudi Aviation Infrastructure Glossary: A to Z Terms Buyers Need
A practitioner glossary of the aviation infrastructure terms buyers meet on Saudi projects, covering airfield ground lighting, heliport design, obstruction lighting, arresting systems and the regulatory acronyms behind GACAR and ICAO Annex 14.