Makkah Airport heliport lighting package – new chance for contractors

With the inclusion of a dedicated heliport and state‑of‑the‑the lighting systems in the Makkah International Airport project, contractors now have a clear opening to bid on the heliport lighting package. Northlane Solutions points out the key steps needed to compete effectively.

Project Overview

The latest update from Almarwan shows that the Makkah International Airport will host a purpose‑built heliport alongside the main runway complex. The design calls for LED‑based floodlights, beacons and obstruction lighting that meet the latest ICAO performance criteria. The heliport will serve religious pilgrim traffic, emergency medical flights and corporate charters, meaning it must operate safely from dusk till dawn throughout the year. The airport authority has already earmarked a separate procurement package for the heliport lighting system, signalling a firm timeline for installation before the airport’s full opening.

What the lighting package means for owners

For the airport owner, the new lighting suite promises lower energy consumption, longer service life and reduced maintenance trips. LED floodlights deliver consistent illumination levels even in the harsh desert climate, while modern beacons improve visual guidance for pilots approaching the heliport. The integrated control architecture allows remote monitoring, so any fault can be identified within minutes. This translates into higher operational reliability and a stronger safety record – a critical factor for an airport that will handle millions of pilgrim movements each year.

How contractors can position themselves

Contractors should start by mapping the full scope of LED runway and obstruction lighting that Northlane already supplies. A solid proposal will include a detailed bill of materials, a phased installation plan and a maintenance strategy that aligns with Saudi GACA regulations. Experience with programmable lighting control systems, such as individual lamp control, will set a bid apart. Offering a post‑installation support contract – covering spare parts, routine checks and photometric testing – shows the owner that the contractor can keep the system at peak performance long after handover.

Northlane’s practical experience

Northlane has delivered more than a dozen airfield lighting projects across the Kingdom, ranging from runway edge lights to complex obstruction lighting networks. Our [Airfield Ground Lighting] service covers design, supply and commissioning of LED fixtures that meet local and international standards. For heliport‑specific needs we provide a full suite of solutions – from floodlights and beacons to marking services – through our [Helipad & Heliport Solutions] offering. When a project requires ongoing performance verification, our [Obstruction Lighting] team can install monitoring hardware that feeds real‑time data to a central control room, simplifying fault detection and reducing downtime.

Technical considerations for heliport lighting

LED floodlights for heliports must deliver a minimum of 150 lux on the landing area, with uniformity ratios that prevent dark spots. The chosen fixtures should have a rated life of at least 100,000 hours to survive the high temperature swings typical of the region. Beacon units need a high‑intensity flashing mode that complies with ICAO Annex 14, and they must be mounted on a frangible mast to reduce collision risk. Power distribution should use corrosion‑resistant cables, and the control system must support both local and remote operation. Selecting a constant‑current regulator ensures stable output despite voltage fluctuations on the site.

FAQ

What is the timeline for the heliport lighting procurement?

The airport authority has announced a dedicated procurement window that aligns with the overall construction schedule. Contractors can expect the bid opening within the next few months, with installation to follow shortly after contract award.

Are there specific Saudi standards that the lighting must meet?

Yes, all lighting components must comply with GACA regulations and ICAO Annex 14 performance criteria. Certification from an approved testing laboratory is required before final acceptance.

Can existing runway lighting suppliers bid on the heliport package?

Suppliers that already provide LED runway or obstruction lighting in Saudi Arabia are well‑positioned to extend their portfolio to the heliport. Demonstrating familiarity with the airport’s existing infrastructure can strengthen a bid.

What maintenance services are typically included in the contract?

A typical package covers routine inspections, photometric testing, spare‑part supply and emergency fault response. Many owners prefer a multi‑year support agreement that bundles these services for predictable budgeting.

Get in touch